The works involved in this project consisted of demolition of the listed stone water tower and re-construction of the water tower at an alternative location. The Water tank was carefully removed from the tower, cleaned and the steel treated while it awaited the the tower to be re-constructed. The tower stonework was carefully removed, cleaned, numbered, and stored for re-use by setting down in sequence to facilitate re-build using traditional lime mortar before the water tank itself was re-installed on top.