OB132 Bridge Renewal, Ballinasloe, Co. Galway

Project Description:

The existing metal deck bridge was replaced with a precast concrete bridge. The works involved the removal of the steel bridge , placing of precast bedstones, beams and retaining wall units. Installation of an Aluminium Bridge parapet , double height crash barrier , fencing, road surfacing , telecom and water diversion. The bridge was assessable to traffic after four days.


  • _edit_last : 2
  • _edit_lock : 1410083440:2
  • Client : Iarnród Éireann
  • _rawhtml_settings : 0,0,0,0
  • Engineer : Iarnród Éireann - Structural Design Section, New Works
  • _thumbnail_id : 1103